APM Terminals Maasvlakte II

APM Terminals Maasvlakte II (APMT-MVII) aims to comply with the upcoming European Alternative Fuels Infrastructure Regulation (AFIR) ahead of the mandatory deadline of 1 January 2030. To support this ambition, RSP will make shore power available in phases from the end of 2028 for deep-sea container vessels calling at the APMT-MVII terminal.

APMT MVII is already a CO₂ emission-free terminal, with buildings and sites that are energy-efficient and environmentally friendly. The majority of the equipment used, including the fully electric Lift Automated Guided Vehicles (L-AGVs), contributes to this sustainable character. With the development of shore-based power, APMT is contributing to reducing emissions in the port and reducing noise pollution even further.

Since

2026

under construction

Schedule

Q3 2026: Start of construction of the shore power facilities
Q3 2028: Start of shore power supply

Harold Kunst, Managing Director of APM Terminals Maasvlakte II: "The development of shore power is fully aligned with APM Terminals Maasvlakte II ambition to become Europe’s most sustainable and efficient gateway. This partnership with Rotterdam Shore Power marks an important step in our shared ambition to make the Port of Rotterdam a global leader in sustainability.

Facts & Figures

Length of quay

2 kilometres

Total power

30 MVA

Number of connection points

8 (mobile)

Voltage

6.6 kV

Frequency

60 Hz

Max power per connection point
Max. power per conn. point

7.5 MVA

Looking for a single partner to manage shore power from A to Z? Get in touch with us.